Integrated Planning Model (IPM)

ICF's Integrated Planning Model (IPM®) provides true integration of wholesale power, system reliability, environmental constraints, 燃料的选择, 传输, capacity expansion, and all key operational elements of generators on the power grid in a linear optimization framework. The model captures a detailed representation of every electric boiler and generator in the power market being modeled.

ICF has models of both the North American and Europe power markets. Uses for IPM include:

The fundamental logic behind the model determines the least-cost means of meeting electric generation energy and capacity requirements while complying with specified constraints, including air pollution regulations, 传输 constraints, and plant-specific operational constraints.

The versatility of IPM allows users to specify which constraints to exercise and populate IPM with their own datasets.

Our Integrated Planning Model is used by

Versions of IPM have been used to support the U.S. 环境al Protection Agency's (EPA) analyses of utility air emissions,而在 Federal 能源 Regulatory Commission (FERC) benefit-cost analysis of regional 传输 organizations (RTO). Other organizations currently using the model include The Regional Greenhouse Gas Initiative.

Reports that refer to IPM

The Integrated Planning Model is a versatile tool that is used extensively by U.S. federal government agencies and other organizations. Some of the reports that mention it are:

黄金城

Enter your contact information and we will be in touch soon!

Related industries, services, and solutions